If 10 men can complete a piece of work in 30 days how many men are requiredto complete the same job in 25 days?

Respuesta :

AL2006
AL2006 AL2006
  • 22-07-2014
We must assume that all workmen work at the same rate, and keep it up forever.

More men ==> fewer days

so the proportion is:    30/25 = x/10

Cross-multiply the proportion:

300 = 25 x

Divide each side by 25 :

x = 300/25 = 12 men
Answer Link

Otras preguntas

write an email to your friend about organizing a fashion show for chairty
How does the digestive system interact with the circulatory system? A. Messages sent as electrical impulses from the digestive system are transported throughou
The point which divides the line segment joining the points (2, -6) and (3, 4) in the ratio 1 : 2 internally lies in the
Which number line represents the solutions to lx - 5| = 1?
They___dinner andspeaking when I saw them.a) are havingb)were havingc)hadd)have​
Globalization forces small businesses to compete worldwide. The result of globalization is that operation manager (OM) or owner must do which of the following t
If insulin receptors stopped working. The body would no longer receive the message from insulin. Cells would not take up sugar, blood sugar levels would rise, a
A=14 B=7 C=3.5 D=7 square root of 2
Would you be willing to go to war if you were drafted of Vietnam war? Or would you defer? Explain in a sentence
Brainliest and 5 stars for the taking!!! Use synthetic division to solve.