katianCarlanaj
katianCarlanaj katianCarlanaj
  • 21-11-2015
  • Chemistry
contestada

Which of the following is considered a major process flow structure?
a. Lean Manufacturing
b. Project
c. Fabrication
d. Lead Time

Respuesta :

frontloader13 frontloader13
  • 22-11-2015
Since lead time is the time period between the starting and completion of producing a product, lead time is a major process flow structure.
Answer Link

Otras preguntas

Traditional grammars are still completely based on the Latin model. a. True b. False
What is the greatest number which can be made using each of the digital 5,3,1,4,7
Which country has the most permissive law involving physician-assisted suicide in the world? the United States the Netherlands Russia Japan
What form of government places more of its power with the people? a. unitary b. federal c. oligarchy d. confederate
A library’s holdings include the following title: A Forgotten Kingdom, Being a Record of the results obtained from the excavation of two mounds, Atchana and Al
the scale on a map indicates that 1 inch on the map corresponds to actual distance of 100 miles. two cities are 4.7 inches apart on the map. what is the actual
Margo boils 500 L of water to make 80 g of the pasta is Margo boils 2500 mL of water how many grams of pasta can she make?
5/8 minus 5/8 what's the answer
A culture made of a group of people in a particular region or location with shared customs, values, traits, and experiences that are easily identified is called
how do you say please may I go to the toilet in Spanish