GeauxCorey8005 GeauxCorey8005
  • 24-10-2017
  • Social Studies
contestada

__________ have a weakness of being difficult to follow when multiple paths exist, but __________ are more helpful in the hands-on task of managing the 1project.

Respuesta :

andriansp andriansp
  • 04-11-2017
the answer to this question is Gantt charts, networks
The gnantt cahrts is one of the most common method in arranging group schedules within a certain organization.
These charts usually includes several elements such as date of the project, budget flow, and persons that are in-charge for each projects
Answer Link

Otras preguntas

The group of agencies that works most closely with the president is ___.
Which words from the poem best alliterate with the word squat? a. pen / rests c. rump / bends b. nicking / neatly d. scatter / squelch
which of the following examples describes an increase in potential energy? A: a bicycle going down a hill.
If the core of a supernova contains about one solar mass, the core will become a _____. protostar red dwarf white dwarf neutron star black hole
If you have a ____ surface, friction increases
In Jaime's math class, 9 students chose soccer as their favorite sport. This amount represents 3/8 of theach entire class. The equation 3/8s=9 can be used to fi
a line has a slope of 1/2 and a run = 50 what is the rise
Bonds payable issued with collateral are called _______ bonds. A. debenture B. serial C. callable D. secured
James Madison warned of factions (political divisions), in Federalist 10, and this President issued his own warning of political parties in his farewell address
Two functions of the public protector