Bryanprellkenley Bryanprellkenley
  • 24-04-2017
  • Business
contestada

A variant of fiscal-year budgeting whereby a twelve-month projection into the future is maintained at all times is termed

Respuesta :

Erudite1
Erudite1 Erudite1
  • 29-04-2017
A variant of fiscal-year budgeting whereby a twelve-month projection into the future is maintained at all times is called continuos budgeting.
Answer Link

Otras preguntas

If sin θ = 15 over 17, use the Pythagorean Identity to find cos θ.
Mount Rainier is 14,410 feet high. Mount McKinley is 20,320 feet high. How much taller is Mount McKinley?
Write an equation of the line, in slope-intercept form, with a slope of 5 and a y-intercept of -3.
Which assessment question should the nurse ask of a client suspected of being ostracized by a school bully?
Use trigonometric ratios to determine whether or not it is possible to construct triangle ABC if b = 3, c = 5, and B = 45°. In your final answer, include all of
whatisthearclengthofr=6ft
The total amount of interest that will be paid on a 5-year, $90,000 note payable at 11% simple annual interest is?
Fill in the spaces: We entered the village by an _____(adj) path and were shocked by the _______(adj) squalor with which we were immediately presented
Graph the integer and its opposite Need help ASAP With work please
Derek has evaluated his skills and determined that he has excellent reaction time. He wants to sign up for two sports that will play to his strength. Which two