Kayla7ptorwh Kayla7ptorwh
  • 25-02-2017
  • English
contestada

It took construction company 63 days to complete the buildings. how many weeks did it take ? 1 week = 7days

Respuesta :

violetblue
violetblue violetblue
  • 25-02-2017
so it took 9 weeks or 2 months and 1 week
Answer Link

Otras preguntas

A normal distribution has a mean of 4 and a standard deviation of 1. What percent of values are from 4 to 7? IN% of the values are from 4 to 7. (Type an integer
Pedocals develop in wet (humid) climates. True or false?
. A large building is being constructed in the city’s center. Two photographers have been hired to capture the process so that the city has a record of this hi
What is the solution to the equation 1.2m − 3.6 = −0.6m? (1 point) Question 17 options: 1) m = 0.25 2) m = 0.5 3) m = 2 4) m = 3
Alisa is making a design for the bottom of a dress using trapezoid shapes cut from different colors of fabric. Each trapezoid has base lengths 5 inches and 10 i
IN A QUIZ, ASAP. Select the correct possessive form of the word. A. reindeer B. reindeers' C. reindeers's D. reindeer's
If the price level falls, the real value of a dollar Group of answer choices falls, so people will want to buy less. This response helps explain the slope of th
One side of the follower garden is 3 times as long as a other. If the area is 48. What are the dimensions of the garden?
30 + a = 40 40 + b = 30 c - 3 = 8 d - 3 = 8 plz answer.
A boy shooting at a target receives rs. 15 for hitting the bull's eye and loses rs.6 for missing the target. Out of 50 shots, the boy missed 5 shots. How much m