Seudónimo Seudónimo
  • 22-02-2017
  • Physics
contestada

A box weighing 4.0 N is lifted 3.0 meters. How much work is done on the box?

0.0 J
1.0 J
7.0 J
12 J

Respuesta :

suryasanjay7120 suryasanjay7120
  • 22-02-2017
I think the answer is option c
Answer Link
nesabug
nesabug nesabug
  • 22-02-2017
Use the work formula:
Work= Force x Distance
W= 4 x 3
W= 12 J
So the last one.

Hope this helps :)
Please give me the brainlyest answer.
Answer Link

Otras preguntas

perimeter 254 meters and dimension measures 6 meters​
A company is investing in a solar panel system to reduce its electricity costs. The system requires a cash payment of $118,982.50 today. The system is expected
Big Ideas: The following Big Ideas are intended to provide clear focus and purpose to the lessons. Read each statement and think about how what you have learned
Help! I dont have much lime left ;-;
eep- in math :3 please help meh
What evidence can scientists collect from body fossils? Select all correct answers the fossils can tell scientists about the size and shape of the organism scie
1. What is the importance of a flowchart ? 2. How can flowchart represent process ?​
a sprinkler that sprays waiter in a circular area
This lab was designed to teach you more about using Scanner to chop up Strings. Lab Description : Take a group of numbers all on the same line and average the n
The main limiting factor for the plants and animals that live in the deciduous biome is ________________. Question 7 options: tornadoes cold temperatures in win