Explain the process that economists use to conduct a cost benefit analysis (cbd)for a high speed rail

Respuesta :

Tundexi
Tundexi Tundexi
  • 06-06-2022

The economist uses the cost benefit analysis (cbd) for a high speed rail to determine the project benefit expected therein.

What is a cost-benefit analysis?

This involves the tallying up all costs of a project and subtracting that amount from the total projected benefits of the project or decision.

Hence, the economist uses the cost benefit analysis (cbd) for a high speed rail to determine the project benefit expected therein.

Read more about cost benefit analysis

brainly.com/question/13776709

#SPJ4

Answer Link

Otras preguntas

Threeangles of a quadrilateral are equal and its fourth angel is 120° . Find all the angels
Los lados de un triangulo rectangulo miden 6cm, 8cm, y 10cm ¿cuanto mediran los catetos de un triangulo semejante al primero si tiene 5cm de largo en su hipoten
What helps with asexual reproduction of yeast
if k(x) = 2x-3x then k(9) is. A.315 B.307 C.159 Or D.153 show work plzz thanks
what is the range if the function in this table?
what is the range if the function in this table?
hey! i have a project about spanish culture. could you help me?
how could you use biotechnology to protect a plant from insect damage?a)insert Gene's that anti-insect chemicals into the plant b)insert Gene's that produce ins
Sweet T saved 20% of the total cost of the Green-Eyed Fleas new album let there be fleas on earth.If the regular price is $30,how much did sweet T save
What is general biology?