NOTKNOWING NOTKNOWING
  • 25-10-2021
  • Mathematics
contestada

How long would it take eight lumberjacks to chop down eight trees at the same rate?

Respuesta :

Gervy
Gervy Gervy
  • 25-10-2021

Answer:

4 hours

Step-by-step explanation:

It take them 1.5 h ÷ 0.5 h to chop down 1 tree, so it would take 0.5 h × 8 = 4 hours to chop down 8 trees

Answer Link

Otras preguntas

Find the ratio In simplest form. 15 minutes to 2 hours
A negative charge is moving across a room from south to north. A magnetic field runs from east to west. In what direction is the magnetic force on the moving ne
Which departments handle both economic and social issues? Public safety, education natural resources, transportation education, natural resources transportation
In 2009, Florida suffered more __________ fatalities than any other state.
Correct multiple choice answers
How do nationalism play a part in the rise of Italy ang Germany?
given the functions, f(x) =2x^2 - x + 1, calculate the average rate of change of the function from x = 1 to x = 3. 1. 7 2. 14 3. 16 4. 28
The term “Peninsulare” directly refers to the ___ Peninsula
15 less than twice a number g is 19. Find g.
Within the context of a supply chain, _____ is the ability of a logistics system to satisfy users in terms of time, dependability, communications, and convenien