Six people to can perform a task in 8 days. If we add 2 equally able people, how long would it take?

Respuesta :

madankapoor10
madankapoor10 madankapoor10
  • 24-03-2014
1 man does 1/48th piece of work per day
then 8 man do 1/6th piece of work per day
so they can do the work in 6 days

Answer Link
salmheiri
salmheiri salmheiri
  • 21-02-2022

Answer:

6 days

Step-by-step explanation:

Answer Link

Otras preguntas

His pattern pushes warm, dry African winds called __________ toward Europe. a. drifts b. foehns c. mistrals d. siroccos
sentence for commerical farming
The two types of capital are human and _____________capital. A. land B. physical C. resource D. knowledge
the vote of one individual doea not matter because it cannot affect the outcome of an election
Which of the following accurately pairs the type of receptor to the stimuli in which it responds? A. Chemoreceptor–pressure B. Photoreceptor–chemicals C. Pai
Evaporation _____. occurs equally all over the globe is the change in state from a gas to a liquid happens more quickly in warm areas than cool ones is the proc
How did advances in military technology contribute to the stalemate that developed in Europe during world war I? A. Countries rarely attacked one another's land
Difference between cylinder and cone
What are the coordinates for the outlier in the data? ( , )   x 3 4 3 4 6 8 5 7 2 y 1 8 3 7 28 7 6 3 9
The acceleration of gravity is a constant equal to _______ meters per second squared. A. 9.8 B. 7.6 C. 8.4 D. 10.2