jimit jimit
  • 22-11-2020
  • Engineering
contestada

How does a project differ from an ongoing work effort?

Respuesta :

anjelojay4
anjelojay4 anjelojay4
  • 22-11-2020

Answer:

Projects have a fixed budget, while operations have to earn a profit to run the business. Projects are executed to start a new business objective and terminated when it is achieved, while operational work does not produce anything new and is ongoing.

Hope this helped!

Answer Link

Otras preguntas

How can you find the net force if two forces act in opposite direction?
Sara is putting away a pile of 36crayons she can pack them in boxes of10crayons or as single crayons .what are the different ways Sara can pack the crayons?
Doing monomials. How do you do this one?
Sara is putting away a pile of 36crayons she can pack them in boxes of10crayons or as single crayons .what are the different ways Sara can pack the crayons?
what is the lithosphere made out of?
Sara is putting away a pile of 36crayons she can pack them in boxes of10crayons or as single crayons .what are the different ways Sara can pack the crayons?
If a yield sign is a regular polygon what is the measure of each angle
What is 47% of 164 while using a fraction to estimate the percent of each number.
A 100 centimeter stick broke into 3 pieces one piece was 7 centimeters long and another was 34 centimeters long how long was the third piece
Sylvan withdrew 2/5 of the amount in his savings account, and spent 7/10 of that money.  What fraction of his total savings does he still have?