venkimtech14 venkimtech14
  • 24-10-2020
  • Mathematics
contestada

a field can be cleared by 33 men in 15days. how many more person required if the field has to be cleared 4 days earlier?​

Respuesta :

wsookhuei
wsookhuei wsookhuei
  • 24-10-2020

Answer:

12 men

Step-by-step explanation:

33men x 15 days = the whole project

Let the men that are required be x.

33 x 15 = (15-4)x

495 = 11x

x = 45

Answer Link

Otras preguntas

x+5+x11=10 Solve for X and show the work please!
What is the weight of the earth?
How do you cite from an article? Can you give me an example as well please!!!!!! Answer this
Find the temperature of the bar (made of aluminum, k = 202.4 W/m*k) with a rectangular cross-section at the center point. The Left end of rectangular is 80 c, t
find the product -7 (-a^2) (-b^3)
After 29 years Ms. Payson is getting ready to retire from teaching. As part of her employee benefits her school will give her a pension that is based on the ave
Unpolarized light passes through a combination of two ideal polarizers. The transmission axes of the first polarizer and the second polarizer are at 30.0° to ea
4 (2(-2) + 3(3) -2(4.2)
Why did Shakespeare occasionally use confusing word order?
What is 2 times -3+ 1 inside absolute value