jaunapatterson5462 jaunapatterson5462
  • 23-07-2020
  • Business
contestada

To answer this question, refer to the crossover chart. For high volume production process, Process A would most likely be the best option. Group of answer choices True False

Respuesta :

Parrain
Parrain Parrain
  • 25-07-2020

Answer: False

Explanation:

For a high volume Process, Process C would be the best option because it has the lowest cost at higher volumes.

Process A would be the best option if the company was looking for a low volume production process because at that point, it has the lowest cost. When it comes to high volume production though, Option A is the worst option as it is the most expensive.

Ver imagen Parrain
Answer Link

Otras preguntas

Which action is taken by an offensive player in the game of lacrosse?
What is the solution to the equation –10.3+y = 5.2? a. –5.1 b. 5.1 c. –15.5 d. 15.5
Please help me round the number to the given place value. 1.044; hundredths a. 1.5 b. 1.4 c. 1.05 d. 1.04
Which event directly inspired the drafting of the Declaration of Independence? The passing of the Sugar Act The passing of the Stamp Act The drafting of Common
Metthew's cell phone plan charges $15 a monnth and 25 cents for every minute.If his bill for one month is $30.75,how many minutes did he use?Write and solve the
Compatible numbers to estimate 26x22
Sentence using the word compound
What are 3 ways rocks change through time
how does eye location best represent the relationship between structure and function
Two strong permanent magnets are placed one inch apart. Which two fundamental forces will most affect them? strong and electromagnetic electromagnetic and gra