bezakarelle bezakarelle
  • 24-06-2020
  • Mathematics
contestada

if 8 people can pick the apples from the trees in 6 days, how long will it take 12 people

Respuesta :

mhanifa
mhanifa mhanifa
  • 24-06-2020

Answer:

4 days

Step-by-step explanation:

8 people can do the job in 6 days, job is this case is picking apples.

  • The amount of the job (apples) is same and the only variable is number of people which changes the time accordingly.  

1 person can do same job for 6*8= 48 days

12 people can do same for 48/12= 4 days

Answer Link

Otras preguntas

a figures skater rotating at 5 rads with arms extended has a moment of inertia of 2.25 kg. if the arms are pulled in so the moment of inertia decrease to 1.8 wh
Find the slope of the line.
SIMPLIFY. m2 x m5 x m3=???? PLEASE HELP!!!!
Simplify the expression: (− 2/3 pq^4)^2·(−27p^5q)
PLEASE HELP THE QUESTION IS BELOW!!
in a discussion kyan cities a recent article in a scientific journal that backs up his point about the benefits of nuclear energy. Which discussion technique is
Martin competed in a speed skating race. The surface of the ice rink was at-5°C for the race. The temperature outside was 5°C. How much warmer wasthe temperatur
Reflect the given pre-image over = −1 followed by = −7. Find the new coordinates.
Select the correct location on the map. Identify the former Soviet nation that allowed people to flee to West Germany in 1989.
Find the product. (5ab3b) (2ab) PLEASE HELP!!! ASAP!!!