josephmcintosh9324 josephmcintosh9324
  • 23-04-2020
  • Social Studies
contestada

What is the intersection of the assessed probability and severity of a hazard

Respuesta :

capricornusyellow capricornusyellow
  • 27-04-2020

Answer:

Called in RM process is the Risk level

Explanation:

RM is called a risk management process. There are different steps in the Risk Management level.

  • To identify the risk level
  • To analyze the risk level
  • To evaluate and rank the risk level
  • To give the treatment level to the risk
  • To monitor the risk level and to review that risk level.

Answer Link

Otras preguntas

(78 n + 42)^2, when n = 91
If x = y + z and x + y =6 and x = 10, then z = _____? a. 4 c. 14 b. 8 d. 16
A(n) __________ is a warm, dry wind that blows down the side of a mountain
The perimeter of the top of a desk is 54 inches . if the length of the desk is 15 . what is the is the width of the desk
Share 56 pound in the ratio 1:3:4
Congress shall have power...to make all laws which shall be necessary and proper for carrying into execution the foregoing powers.... This section of the Consti
Which value is a solution of the equation 85= 120-w?
Foods that allow microorganisms to grow are called parasites.
Which factor has the greatest influence on the development of new, inheritable characteristics? (1) combinations of genes resulting from mitosis (2) m
What gives the gem amethyst is purplish color? a. Quartz b. Iron c. Oxygen d. Titanium