During the initiation phase the user needs are looked at in some detail, they are called..?

A=User focus
B=User targets
C=User requirements

Respuesta :

CreamyPi314
CreamyPi314 CreamyPi314
  • 22-04-2020

Answer:

C

Explanation:

User requirements are the needs of the users, even though some people get confused and think that user requirements are not needs, but in fact prerequisites. However, this is incorrect for the workplace states that needs are required to be fulfilled.

Answer Link

Otras preguntas

Including the tax what will be the mean cost of each shirt
Help me, Thanks!! 1)A room is being heated at the rate of r(t) = (0.3t)1/2, where r(t) is measured in degrees Fahrenheit per minute. If the temperature in the r
What is the product of (x-3)(2x+1)
Easy problem !! Will be marked brainliest :) Mrs. Tremain wants to run 100 kilometers during the first three months of the year. In January she ran 24 kilomet
What was the anaconda plan or union blockade stopping?
(X+3)(x-4) what is the middle term in he simplified product?
A new book comes out in paperback. The paperback version is for 40% less than the hardcover version. Part A: If the price of the hardcover version is $24.99, v
What is the term for an area where organisms live together with their physical environment? A.Ecosystem B.Population C.Biosphere D.Community
I need immediate help!!!
The true false answers