kalpanathakulla680 kalpanathakulla680
  • 23-02-2020
  • Mathematics
contestada

30 men can do a piece of work in 40 days .how long it take to complete the work if 5 men were reduced​

Respuesta :

Аноним Аноним
  • 23-02-2020
30 men -> 40 days
1 man -> 1/1/3 days
30-5men = 25 men
25 men -> 1/1/3 x 25
= 33/1/3 days
Answer Link
tolaosunrinde
tolaosunrinde tolaosunrinde
  • 23-02-2020

Answer: 48 days

Step-by-step explanation:

If it takes 30men 40days to complete a task, 1 man takes 30×40= 1200 days

25 men will therefore take 1200/25= 48 days.

Answer Link

Otras preguntas

50a3 + 10a2 A. 10a2(5a + 1) B. 5a2(10a + 2) C. 10a2(5a - 1) D. 10a(5a2 + 1a)
Which of the following statements about the number line is true? a. Number lines can't help you compare numerals. b. Number lines end with the number 10. c.
Which list represents the sequence of social positions in the feudal hierarchy (starting from the uppermost tier)? A.knight, lord, clergy, serf B.king, lord, cl
Is 8/12 and 24/36 equivalent?
The price for a particular herb is 49 cents for 6 ounces. What is the price of the herb in dollars per pound?
How did new technology promote urban growth around the turn of the century
Round 248,739 to nearest hundred
Why did many people seek help from priests as the Black Death spread through Europe?
A poor man has tried every legal means possible to get the medicine that will save his child’s life. He is placed in a situation where it would be easy to steal
An investigation involves determining which metal is better for making pots that will cook food faster. Which is the best hypothesis to use for this investigati