ianocampo2959 ianocampo2959
  • 25-01-2020
  • Business
contestada

Most projects will employ bottom-up estimating at some point to serve as a basis for estimating cash flow needs and for controlling the project.

True

False

Respuesta :

zuwairahdahir
zuwairahdahir zuwairahdahir
  • 25-01-2020

Answer:

The statement is TRUE

Answer Link

Otras preguntas

one car travels east for 360 m over a period of 15 seconds. a second car travels west for 120 m over a period of 5 seconds. what is true about their speeds? the
In a school 3/5 pupils are boys and there were 240 girls. How many boys were in the school? How many children were in total?
How did the collapse of the Romanov dynasty increase instability in Europe?
What Is Representative Democracy?
what is the payment if there is $219 with a 3.5% sales tax
How do yuh evaluate the expression Log 4096 4
Which explanation of the solar system best fits the observations of the planets and how they orbit the sun? (Points : 3)       The gravity of a large, massive
A right cylinder has a diameter of 30 mm and a height of 30 mm, as shown.What is the volume of the cylinder?
At 9:00 a.m. marsha found a parking meter that still had 5 minute until it expired. She quickly put a quarter, 1 dime, and a nickel into The meter and went to h
What is the pitch of a sound wave?