rosamgarcia4 rosamgarcia4
  • 23-10-2019
  • Mathematics
contestada

A machinist can produce 12 parts in 40 min.how many parts can the machinist produce in 4 hours?

Respuesta :

CoolGuyJ CoolGuyJ
  • 23-10-2019
Answer:

72 parts

Steps:

Convert the 4 hours into minutes. There are 60 minutes in an hour. Therefore, 4 hours = 240 minutes.

Divide 240 minutes by 40 minutes. This equals 6. Therefore, the machinist can produce the 12 parts 6 times in 4 hours.

Finally, multiply the 12 parts by the 6 times he can produce. Therefore, the machinist can produce 72 parts in 4 hours.
Answer Link
breeee05
breeee05 breeee05
  • 23-10-2019
1.2 Parts In 4 Hours .
Answer Link

Otras preguntas

Using complete sentences, explain how to find the average rate of change for f(x) from x = 4 to x = 7. My equation is f(x) = - 2(x-6)^2 + 95
the total amount of _________ is the same before and after any transformation
can anyone help me out with this graph ?
3x+5=19 how do I solve this problem ???
A poster is 8 1/2 inches by 11 inches. You enlarge the poster by increasing each dimension by a factor of 2 1/2. What is the area of the new poster?
Wanax was another name for a Mycenaean _____.
25 is 32% of what number?
the ratio of 8 hours to 2 days is
why did so many African Americans migrate north throughout the 1920s? A.) for the milder climate B.)for a chance at a better future C.)to save money D.)to serv
factor completely 1000+27y^3