ariannagonzalez11 ariannagonzalez11
  • 22-06-2018
  • Mathematics
contestada

a construction company can remove 2/3 tons of dirt from construction site each hour how long will it take them to remove 30 tons of dirt from the site?

Respuesta :

Goldenpineapple123
Goldenpineapple123 Goldenpineapple123
  • 22-06-2018
You would want to divide 30 by 2/3 so you would do 30/1 times 3/2. This method is known as keep change flip or kcf (Kentucky Chicken Fried is what some people say) your final answer should come out to 90/2 which simplified is 45. Hope this helped
Answer Link

Otras preguntas

439 • 44 estimate: 10
I need help with number 5!!
Does retrovirus replicate?
The radius RH of a black hole, also known as the event horizon, marks the location where not even light itself can escape from the black hole. That is, no infor
where does most the candles light come from​
what is the difference between anti-Semitism and holocaust​
Last one I have to do!
LCD Industries purchased a supply of electronic components from Entel Corporation on November 1, 2016. In payment for the $25.0 million purchase, LCD issued a 1
Grear Tire Company has produced a new tire with an estimated mean lifetime mileage of 36,500 miles. Management also believes that the standard deviation is 5000
Are you surprised that everyone in the town goes along with the lottery why or why not