skibinskimikey7339 skibinskimikey7339
  • 22-03-2024
  • Physics
contestada

A skier of mass 69.4 kg is pulled up a slope by a motor-driven cable.
how much work is required to pull him a distance of 60.4 m up a 30.1° slope (assumed frictionless) at a constant speed of 2.00 m/s?

Respuesta :

Otras preguntas

how long would it take charlie to run 5 laps
What causes the temperature inversion in the stratosphere?
What are natural threats to information systems?
merge has 14 2/55 feet of chain she wants to make pieces 3/8 foot long how many can she make? slove using decimals show your work
Zach, whose mass is 80 kg, is in an elevator descending at 10 m/s. The elevator takes 3.0 s to brake to a stopat the first floor. a. What is Zach’s app
People from different cultures are most likely to differ with respect to
A pick-up truck is fitted with new tires which have a diameter of 42 inches. How fast will the pick-up truck be moving when the wheels are rotating at 280 revol
mengapa syariat islam tidak bisa di implementasikan secara serius di aceh
A baseball player hits a home run over the left-field fence, which is 104m from the home plate. The ball is hit at a point 1.00m directly above home plate, with
If y varies directly as x, and y=25 when x=5, find y when x=25