Using the PERT formula, calculate the time (t) for each
activity.
QUESTION 4 4.1 The following table represents data of a project you are working on: Most Optimistic Most likely Activity Predecessor Most Pessimistic Time in days 4 H 8 24 10 11 12 24 14 25 16 27 15 3

Respuesta :

Otras preguntas

How much will it cost for Gary to reserve 13 lanes?
Why has wind erosion shaped so many landforms in the American Southwest
Yoshi and Rana serve muffins. There are three muffins with nuts. I/6 of the muffins have nuts. What fraction of the muffins do not have nuts?
What is 15% from $850
Which element has two valence electrons? lithium (Li) argon (Ar) calcium (Ca) fluorine (F)
Which sentence has a misplaced adjective phrase? A: I hope that my gorilla costume with the mask wins a prize. B: The athlete went to see a doctor with a broken
What is the primary purpose of a political action committee? to increase awareness of a particular political issue to organize elections at the local and state
change 116% into a fraction and simplify
What did the Egyptians do that showed they believed in the afterlife? A. They made jewelry out of lapis lazuli gem stones. B. They filled tombs with food, cloth
The unit rate of 300 ft in 48 seconds