contestada

G and Z can do a work in 12 days (together). G can work alone in 20 days. so how many days it will take Z to finish the work alone?

answer will be 30 days. please show calculation

Respuesta :

Otras preguntas

The cheetah, which is the fastest land mammal, can accelerate from 0.0 mi/hr to 70.0 mi/hr in 3.0 seconds. What is the acceleration of the cheetah? Give your a
Which of the following best explains why 1-butanol, CH₃CH₂CH₂CH₂OH, has a higher surface tension than its isomer, diethyl ether, CH₃CH₂OCH₂CH₃? (A) the higher d
the area of a circle 200 mm in diameter is approximately how many times greater than the area of circle 40 mm in diameter
What energy transformations are there in a Ferris Wheel?
60% of 10 help me ///////////
Courier charges for packages to a certain destination are 65 cents for the first 250 grams and 10 cents for each additional 100 grams or part thereof. What coul
Find 12 1/2% of 96 men
In the mid 1800s, much of the South remained agricultural rather then moving toward manufacturing. Many farmers relied on cotton as their main crop. Which of th
how much did it cost to manufacture a Mig-21 Fishbed fighter jet.
Find 12 1/2% of 96 men